1. COMPONENT OF THE COMPLETE OBJECT FURNACE INSTALLATION FOR RE-FIRING OF CARBON GRAPHITE PRODUCTS. 8 (57 21%) SET OF PIPELINES: GAS PIPELINE-MAIN GAS STATION - 1 SET-SECTIONS OF MAIN GAS MEASURING AND REGULATING SECTION - 1 SET-PIPELINE ORDINARY STEEL - 1 SET-SUPPORT OF THE PIPELINE ORDINARY STEEL - 1 SET.-CONNECTING ELEMENTS - 1 SET.ACCORDING TO THE CHECKLIST ?PRK-KO-110-0008-20 FROM 10.04.2020 THE PRODUCT IS STACKED. THE PRINCIPLE OF OPERATION: THE PRODUCT IS LOADED ON THE ROLLED OUT FURNACE WITH THE HELP OF LIFTING MECHANISMS. THE MOBILE PLATFORM AUTOMATICALLY MOVES THE ROLLING HEARTH FROM / TO THE FURNACE. THE HIGH TEMPERATURE IN THE FURNACE IS CREATED DUE TO COMBUSTION OF FUEL (GAS). DURING CIRCULATION GASES PASS BURNERS AND BURN AS A RESULT OF WHICH THE ATMOSPHERE HEATS UP. IT CONSISTS OF THE FOLLOWING COMPONENTS: THE FURNACE WITH LIFTING GATE FOR THE ROLLED-OUT HEARTH OF MOD. -RE-BAKING (1 SET) ROLLING FLOOR (2 SETS) MOBILE SYSTEM
1. COMPONENT OF THE COMPLETE OBJECT FURNACE INSTALLATION FOR RE-FIRING OF CARBON GRAPHITE PRODUCTS. 8 (57 21%) SET OF PIPELINES: GAS PIPELINE-MAIN GAS STATION - 1 SET-SECTIONS OF MAIN GAS MEASURING AND REGULATING SECTION - 1 SET-PIPELINE ORDINARY STEEL - 1 SET-SUPPORT OF THE PIPELINE ORDINARY STEEL - 1 SET.-CONNECTING ELEMENTS - 1 SET.ACCORDING TO THE CHECKLIST ?PRK-KO-110-0008-20 FROM 10.04.2020 THE PRODUCT IS STACKED. THE PRINCIPLE OF OPERATION: THE PRODUCT IS LOADED ON THE ROLLED OUT FURNACE WITH THE HELP OF LIFTING MECHANISMS. THE MOBILE PLATFORM AUTOMATICALLY MOVES THE ROLLING HEARTH FROM / TO THE FURNACE. THE HIGH TEMPERATURE IN THE FURNACE IS CREATED DUE TO COMBUSTION OF FUEL (GAS). DURING CIRCULATION GASES PASS BURNERS AND BURN AS A RESULT OF WHICH THE ATMOSPHERE HEATS UP. IT CONSISTS OF THE FOLLOWING COMPONENTS: THE FURNACE WITH LIFTING GATE FOR THE ROLLED-OUT HEARTH OF MOD. -RE-BAKING (1 SET) ROLLING FLOOR (2 SETS) MOBILE SYSTEM
1. COMPONENT OF THE COMPLETE OBJECT FURNACE INSTALLATION FOR RE-FIRING OF CARBON GRAPHITE PRODUCTS. 27 (29 19%) MOBILE PLATFORM SYSTEMMOBILE PLATFORM: -STRENGTH WELDED STEEL STRUCTURE WITH CENTERING RING AND DRIVE MECHANISM THAT EXTENDS TO TRANSPORT THE FURNACE HEARTH ON BOTH SIDES-DEVICE FOR PULLING AND TOUCHING THE RAIN COVER OF THE BOTTOM.-POWER SUPPLY USING A POWER BUS / SUSPENSION LINE (EXECUTION FOR OUTDOOR INSTALLATION) - WITH * CONNECTING ELEMENTS. ACCORDING TO THE CHECKLIST ?PRK-KO-110-0008-20 FROM 04/10/2020. PRODUCTION IS STACKED. THE PRINCIPLE OF WORK: PRODUCTION IS LOADED ON A ROLLED OUT FURNACE BOTTOM BY MEANS OF LIFTING MECHANISMS. THE MOBILE PLATFORM AUTOMATICALLY MOVES THE ROLLING HEARTH FROM / TO THE FURNACE. THE HIGH TEMPERATURE IN THE FURNACE IS CREATED DUE TO COMBUSTION OF FUEL (GAS). DURING CIRCULATION GASES PASS BURNERS AND BURN AS A RESULT OF WHICH THE ATMOSPHERE HEATS UP. IT CONSISTS OF THE FOLLOWING COMPONENTS: THE FURNACE WITH LIFTING GATE FOR ROLLED OUT
1. COMPONENT OF THE COMPLETE OBJECT FURNACE INSTALLATION FOR RE-FIRING OF CARBON GRAPHITE PRODUCTS. 27 (29 19%) MOBILE PLATFORM SYSTEMMOBILE PLATFORM: -STRENGTH WELDED STEEL STRUCTURE WITH CENTERING RING AND DRIVE MECHANISM THAT EXTENDS TO TRANSPORT THE FURNACE HEARTH ON BOTH SIDES-DEVICE FOR PULLING AND TOUCHING THE RAIN COVER OF THE BOTTOM.-POWER SUPPLY USING A POWER BUS / SUSPENSION LINE (EXECUTION FOR OUTDOOR INSTALLATION) - WITH * CONNECTING ELEMENTS. ACCORDING TO THE CHECKLIST ?PRK-KO-110-0008-20 FROM 04/10/2020. PRODUCTION IS STACKED. THE PRINCIPLE OF WORK: PRODUCTION IS LOADED ON A ROLLED OUT FURNACE BOTTOM BY MEANS OF LIFTING MECHANISMS. THE MOBILE PLATFORM AUTOMATICALLY MOVES THE ROLLING HEARTH FROM / TO THE FURNACE. THE HIGH TEMPERATURE IN THE FURNACE IS CREATED DUE TO COMBUSTION OF FUEL (GAS). DURING CIRCULATION GASES PASS BURNERS AND BURN AS A RESULT OF WHICH THE ATMOSPHERE HEATS UP. IT CONSISTS OF THE FOLLOWING COMPONENTS: THE FURNACE WITH LIFTING GATE FOR ROLLED OUT
07-May-2020
8417807000
1. COMPONENT OF THE COMPLETE OBJECT FURNACE INSTALLATION FOR RE-FIRING OF CARBON GRAPHITE PRODUCTS. 4 (0.38%) HEATING SYSTEM: IGNITION AND SAFETY DEVICE: -12 ROOF BURNERS - 1 SET.-8 IGNITION BURNERS - 1 SET-20 TORCH TUBE SIC - 1 SET-20 BURNER CONTROL - 1 SET-20 BURNER SEALS - 1 SET-CONNECTING ELEMENTS - 1 SET. ACCORDING TO THE CHECKLIST ?PRK-KO-110-0008-20 FROM 10.04.2020 G. IT IS INTENDED FOR REPEATED FIRING OF CARBONITE PRODUCTS WITHOUT BULK MATERIAL. THE PRODUCTS ARE STACKED. THE PRINCIPLE OF OPERATION: THE PRODUCTS ARE LOADED ON A ROLLED OUT STOVE WITH THE HELP OF LIFTING MECHANISMS. THE MOBILE PLATFORM AUTOMATICALLY MOVES THE ROLLING HEARTH FROM / TO THE FURNACE. THE HIGH TEMPERATURE IN THE FURNACE IS CREATED DUE TO COMBUSTION OF FUEL (GAS). DURING CIRCULATION GASES PASS BURNERS AND BURN AS A RESULT OF WHICH THE ATMOSPHERE HEATS UP. IT CONSISTS OF THE FOLLOWING COMPONENTS: THE FURNACE WITH LIFTING GATE FOR THE ROLLED-OUT HEARTH. WCG 84/12/85-U -RE-B
1. COMPONENT OF THE COMPLETE OBJECT FURNACE INSTALLATION FOR RE-FIRING OF CARBON GRAPHITE PRODUCTS. 4 (0.38%) HEATING SYSTEM: IGNITION AND SAFETY DEVICE: -12 ROOF BURNERS - 1 SET.-8 IGNITION BURNERS - 1 SET-20 TORCH TUBE SIC - 1 SET-20 BURNER CONTROL - 1 SET-20 BURNER SEALS - 1 SET-CONNECTING ELEMENTS - 1 SET. ACCORDING TO THE CHECKLIST ?PRK-KO-110-0008-20 FROM 10.04.2020 G. IT IS INTENDED FOR REPEATED FIRING OF CARBONITE PRODUCTS WITHOUT BULK MATERIAL. THE PRODUCTS ARE STACKED. THE PRINCIPLE OF OPERATION: THE PRODUCTS ARE LOADED ON A ROLLED OUT STOVE WITH THE HELP OF LIFTING MECHANISMS. THE MOBILE PLATFORM AUTOMATICALLY MOVES THE ROLLING HEARTH FROM / TO THE FURNACE. THE HIGH TEMPERATURE IN THE FURNACE IS CREATED DUE TO COMBUSTION OF FUEL (GAS). DURING CIRCULATION GASES PASS BURNERS AND BURN AS A RESULT OF WHICH THE ATMOSPHERE HEATS UP. IT CONSISTS OF THE FOLLOWING COMPONENTS: THE FURNACE WITH LIFTING GATE FOR THE ROLLED-OUT HEARTH. WCG 84/12/85-U -RE-B
07-May-2020
8417807000
1. COMPONENT OF THE COMPLETE OBJECT FURNACE INSTALLATION FOR RE-FIRING OF CARBON GRAPHITE PRODUCTS. 9 (0 26%) SET OF PIPELINES: AIR FOR SMOKING: - THE FAN OF AIR FOR SMOKING USUAL STEEL (FREQUENCY-CONTROLLED) - 1 SET-COMPENSATOR FROM THE INJECTION SIDE - 1 SET-PRESSURE RELAY - 1 SET-PIPELINE USUAL STEEL - 1 SET OF SUPPORT OF THE PIPELINE - 1 SET OF CONNECTING ELEMENTS - 1 SET. ACCORDING TO THE CHECKLIST ?PRK-KO-110-0008-20 FROM 10.04.2020 PURPOSE - FOR THE FURNACE OF RE-FIRING OF CARBONITE PRODUCTS WITHOUT POURING MATERIAL. THE PRODUCTS ARE STACKED. THE PRINCIPLE OF OPERATION: THE PRODUCTS ARE LOADED ON A ROLLED OUT STOVE WITH THE HELP OF LIFTING MECHANISMS. THE MOBILE PLATFORM AUTOMATICALLY MOVES THE ROLLING HEARTH FROM / TO THE FURNACE. THE HIGH TEMPERATURE IN THE FURNACE IS CREATED DUE TO COMBUSTION OF FUEL (GAS). DURING CIRCULATION GASES PASS BURNERS AND BURN AS A RESULT OF WHICH THE ATMOSPHERE HEATS UP. IT CONSISTS OF THE FOLLOWING COMPONENTS: THE FURNACE WITH LIFTING GATE FOR ROLLED OUT
1. COMPONENT OF THE COMPLETE OBJECT FURNACE INSTALLATION FOR RE-FIRING OF CARBON GRAPHITE PRODUCTS. 9 (0 26%) SET OF PIPELINES: AIR FOR SMOKING: - THE FAN OF AIR FOR SMOKING USUAL STEEL (FREQUENCY-CONTROLLED) - 1 SET-COMPENSATOR FROM THE INJECTION SIDE - 1 SET-PRESSURE RELAY - 1 SET-PIPELINE USUAL STEEL - 1 SET OF SUPPORT OF THE PIPELINE - 1 SET OF CONNECTING ELEMENTS - 1 SET. ACCORDING TO THE CHECKLIST ?PRK-KO-110-0008-20 FROM 10.04.2020 PURPOSE - FOR THE FURNACE OF RE-FIRING OF CARBONITE PRODUCTS WITHOUT POURING MATERIAL. THE PRODUCTS ARE STACKED. THE PRINCIPLE OF OPERATION: THE PRODUCTS ARE LOADED ON A ROLLED OUT STOVE WITH THE HELP OF LIFTING MECHANISMS. THE MOBILE PLATFORM AUTOMATICALLY MOVES THE ROLLING HEARTH FROM / TO THE FURNACE. THE HIGH TEMPERATURE IN THE FURNACE IS CREATED DUE TO COMBUSTION OF FUEL (GAS). DURING CIRCULATION GASES PASS BURNERS AND BURN AS A RESULT OF WHICH THE ATMOSPHERE HEATS UP. IT CONSISTS OF THE FOLLOWING COMPONENTS: THE FURNACE WITH LIFTING GATE FOR ROLLED OUT
07-May-2020
8417807000
1. COMPONENT OF THE COMPLETE OBJECT FURNACE INSTALLATION FOR RE-FIRING OF CARBON GRAPHITE PRODUCTS. 11 (0 14%) SET OF PIPELINES: NITROGEN: - A SITE OF REGULATION OF PRESSURE AND SAFETY OF PEMAX (4 BAR) - 1 SET - THE PIPELINE USUAL STEEL - 1 SET - SUPPORT FOR THE PIPELINE - 1 SET - CONNECTING ELEMENTS - 1 SET .ACCORDING TO THE CHECKLIST ?PRK-KO-110-0008-20 FROM 10.04.2020 PURPOSE - FOR THE FURNACE OF RE-FIRING OF CARBON GRAPHITE PRODUCTS WITHOUT BULK MATERIAL. THE PRODUCTS ARE STACKED. THE PRINCIPLE OF OPERATION: THE PRODUCTS ARE LOADED ON A ROLLED OUT STOVE WITH THE HELP OF LIFTING MECHANISMS. THE MOBILE PLATFORM AUTOMATICALLY MOVES THE ROLLING HEARTH FROM / TO THE FURNACE. THE HIGH TEMPERATURE IN THE FURNACE IS CREATED DUE TO COMBUSTION OF FUEL (GAS). DURING CIRCULATION GASES PASS BURNERS AND BURN AS A RESULT OF WHICH THE ATMOSPHERE HEATS UP. IT CONSISTS OF THE FOLLOWING COMPONENTS: THE FURNACE WITH LIFTING GATE FOR THE ROLLED-OUT HEARTH. WCG 84/12/85-U -RE-BAKING (1 SET) ROLLING FLOOR (2 SETS) P
1. COMPONENT OF THE COMPLETE OBJECT FURNACE INSTALLATION FOR RE-FIRING OF CARBON GRAPHITE PRODUCTS. 11 (0 14%) SET OF PIPELINES: NITROGEN: - A SITE OF REGULATION OF PRESSURE AND SAFETY OF PEMAX (4 BAR) - 1 SET - THE PIPELINE USUAL STEEL - 1 SET - SUPPORT FOR THE PIPELINE - 1 SET - CONNECTING ELEMENTS - 1 SET .ACCORDING TO THE CHECKLIST ?PRK-KO-110-0008-20 FROM 10.04.2020 PURPOSE - FOR THE FURNACE OF RE-FIRING OF CARBON GRAPHITE PRODUCTS WITHOUT BULK MATERIAL. THE PRODUCTS ARE STACKED. THE PRINCIPLE OF OPERATION: THE PRODUCTS ARE LOADED ON A ROLLED OUT STOVE WITH THE HELP OF LIFTING MECHANISMS. THE MOBILE PLATFORM AUTOMATICALLY MOVES THE ROLLING HEARTH FROM / TO THE FURNACE. THE HIGH TEMPERATURE IN THE FURNACE IS CREATED DUE TO COMBUSTION OF FUEL (GAS). DURING CIRCULATION GASES PASS BURNERS AND BURN AS A RESULT OF WHICH THE ATMOSPHERE HEATS UP. IT CONSISTS OF THE FOLLOWING COMPONENTS: THE FURNACE WITH LIFTING GATE FOR THE ROLLED-OUT HEARTH. WCG 84/12/85-U -RE-BAKING (1 SET) ROLLING FLOOR (2 SETS) P