LEAF RAKES CENTRAL SLAG (PT BOILER) -MIDDLE SCRAPER LINKS (CAST STEEL) NEW 100%
LEAF RAKES CENTRAL SLAG (PT BOILER) -MIDDLE SCRAPER LINKS (CAST STEEL) NEW 100%
20-May-2021
8404101900
AUXILIARY EQUIPMENT FOR BOILER: BOILER SYSTEM HEATER MODEL SMQ-25 SPECIFICATION: 25T/H 80PCS 2.5M FIN TUBE .NSX:LINYI HENGCHANG BOILER FITTINGS FACTORY.100% BRAND NEW
AUXILIARY EQUIPMENT FOR BOILER: BOILER SYSTEM HEATER MODEL SMQ-25 SPECIFICATION: 25T/H 80PCS 2.5M FIN TUBE .NSX:LINYI HENGCHANG BOILER FITTINGS FACTORY.100% BRAND NEW
06-May-2021
8404200000
CAST IRON CONDENSER USED IN GAS PIPELINE SET PRESSURE 1.6MPA MODEL: NJA3 SIZE: 15A .TLV BRAND. NEW:100%
CAST IRON CONDENSER USED IN GAS PIPELINE SET PRESSURE 1.6MPA MODEL: NJA3 SIZE: 15A .TLV BRAND. NEW:100%
25-March-2022
8404101900
E-500D WATER HEATER - WATER PREHEATER E-500D AUXILIARY EQUIPMENT FOR BOILERS USED TO INCREASE WATER TEMPERATURE INTO THE BOILER 1 SET = 1 PCS 100% NEW
E-500D WATER HEATER - WATER PREHEATER E-500D AUXILIARY EQUIPMENT FOR BOILERS USED TO INCREASE WATER TEMPERATURE INTO THE BOILER 1 SET = 1 PCS 100% NEW